swactor/docs
Zachery Aaron Shores-Chmielewski 03ae518fb9 docs(vastai): split remote readiness from prioritized local blockers
Commit the E2E plan and two linked checkpoint handoffs. Describe the frozen-checkpoint remote diagnostic track, working deployment/runtime/campaign paths, evidence limits, and the prerequisites for later paid VastAI execution.

Prioritize complete workflow timing, remaining safety verification, and fresh identity-bound qualification on the local track. Remove the internal workload/cleanup budget split as a standalone blocker without changing runtime limits or paid admission guards. Replace the stale active-stream failure status with newer Gate A/campaign evidence and the 186 passing focused review tests.

Validate relative handoff links. Historical target artifacts remain outside Git and must be preserved separately; no remote or paid execution was performed.
2026-09-14 12:21:18 +03:00
..
specs docs(vastai): split remote readiness from prioritized local blockers 2026-09-14 12:21:18 +03:00